Julie Twist Properties are delighted to introduce Finlay’s Yard, an exclusive new-build development comprising 14 state of the art modern apartments over 7 floors, the top 2 of which are duplex’s with south facing terraces. Delivered by the same developers who completed the very successful Finlay’s Warehouse adjacent, this glorious new build is estimated to see its completion in January 2023.
Location
Situated in the historic heart of The Northern Quarter of Manchester which was the birthplace of the industrial revolution in the 18th and 19th Century.
The location is second to none within walking distance to Manchester Piccadilly, the Universities and shopping area, that said with easy access to the main ring road and Manchester International Airport.
The Northern Quarter is one of Manchester’s most beloved areas, bursting with character with truly something for everyone with its diverse offerings. A shoppers dream with everything from vintage clothing shops to big brand names, multiple music shops, a plentiful selection of cafes and restaurants and of course the widely known Afflecks with floor-to-floor independent stores of all varieties. It is also one of Manchester’s most popular areas for nightlife with plenty of independent bars and restaurants with a wide range of unique and quirky themes with there always being new ones to discover.
This area also benefits from neighbouring the city centre’s most popluar areas with Piccadilly Gardens on its doorstep, the Arndale centre a short walk away, and areas such as Manchester’s Gay Village a roughly 10 minutes walk away as well as Deansgate which is roughly 15 minutes walking distance.
The Development
This will be a state of the art modern development which aims to have as much character as the listed warehouse next door, but in an appropriate contemporary way. It is modern but it will acknowledge its context by being built of brick and stone like its neighbours.
14 state of the art apartments, all with a minimum of 2 bedrooms with features such as high standard furnishing, exposed brick walls, generous floor to ceiling heights, kitchens with high quality fitted appliances, lift access, fully double glazed and insulated to modern standards, and the duplexes have south facing terraces.
As mentioned prior the estimated completion date for this development is January 2023.